Sample report

842 Maple Street — Deal Report

12 units · Built 1968 · Multifamily

This is a sample, not a customer report. The property, the documents and every quotation below are fictional — written to show you what a Deal Report looks like before you upload anything of your own.

Act now2Next 12 months5Plan for9Open Questions4

This is not an inspection, engineering, legal or appraisal opinion.

Findings

Every Finding quotes the sentence behind it. Clicking a Source in a real report opens the original page with the passage highlighted; here, the quoted passage is shown beside each Finding.

HVAC

Act nowDocumented

Three of eight units are still on their original 1998 condensers.

Source: Inspection report — page 22

6.1 HVAC — Units 2, 5, and 7 retain their original 1998 condensing units. The remaining five units were replaced in 2016 per maintenance logs. No service contract was included in the documents provided.

Roofing

Next 12 monthsUnclear

The roof was reroofed per the seller’s disclosure. No permit for that work was in the records provided.

Source: Inspection report — page 14

4.3 Roofing — The main roof was reroofed according to the seller’s disclosure statement. No permit for this work was located in the jurisdiction’s building department records provided with the inspection file. The remaining roof sections show granule loss consistent with the stated age.

Plumbing

Plan forDocumented

The water heater is 11 years old, near the end of its expected life.

Source: Inspection report — page 27

7.4 Water heater — The water heater is 11 years old, near the end of the 10 to 13 year service life typical for this type. No leaks were observed at the time of inspection. Replacement cost was not quoted in the documents provided.

13 more Findings like these, grouped the same way, in a full Deal Report.

CapEx

Each line of work carries a cost range and, just as important, where that range came from. A number with no source is a guess; PropertyScope tells you which kind it is.

Replace three original 1998 condensing units (units 2, 5, 7)

Required repair

$14,000–$19,000 — Estimate range, not from your documents

Before closing — units are past double their expected service life

Confirm the roofing permit with the building department

Evaluation

No cost — a records request, not a repair

During diligence — an unpermitted reroof can become a negotiation item

Water heater replacement (original to 2015)

Reserve

$2,400–$3,200 — PropertyScope planning allowance

Within 2 years — operating normally today

Open Questions

What the documents do not answer matters as much as what they do. Each question says who to ask and what to request.

Before closing

The listing notes mention a sewer scope. No scope report was provided.

Unknown. Ask the seller for the report.

Documentation & follow-up

The inspection references maintenance logs for the 2016 HVAC replacement. The logs themselves were not in the file.

Ask the seller for the logs.

2 more Open Questions in the full report.

Make one for your property.

Upload the inspection report or PCA you already have. No account needed to see your Preview — and while PropertyScope is in beta, your first three full Deal Reports are free.

Read my documents